How does BIM 360 work?

How does BIM 360 work?

BIM 360 is an Autodesk cloud-based solution that allows project teams to effectively work in a collaborative environment. In the AEC industry, it connects all project stakeholders to execute projects from conceptual design through construction and ultimately project turnover.

Is BIM 360 same as Revit?

But the fact is, Revit is not BIM. BIM (Building Information Modelling) is a process/technology/ platform and Revit is one of the many BIM tools/applications available like ArchiCAD, AECOsim, Edificius etc. Thus, a 3D model designed using the Revit application is designed for BIM.

How is Navisworks used in BIM?

Navisworks is one of the flagship BIM solutions offered in the AEC Collection that serves design and construction users globally with the ability to holistically review integrated models and data for better control over project planning and outcomes.

What is BIM coordination?

So, what is BIM coordination? In general, it is a process of Building Information Modeling that facilitates the collaboration between MEP engineering, structural engineering and architectural plans.

How do I navigate a 3D model in Revit?

In a 3D view, press shift and use the middle button to orbit the model. The center of rotation is the center of all model geometry. If you select an object and then orbit the view, the selected object is used as the center of rotation. Use the ViewCube to orient the model to predefined positions.

What is BIM 360 glue and how does it work?

With BIM 360 Glue, you can find clashes in merged models. You can easily detect, pinpoint, and track clashes as your team resolves issues. Using the clash review tools, you and your team can manage and streamline the coordination process.

How can I monitor the status of Project Coordination in BIM?

VDC/BIM Managers can monitor the status of project coordination as well as run clash tests, add comments, update clash status, and send notifications. If you’ve installed the Revit, AutoCAD, or Navisworks add-ins for gluing models to BIM 360 Glue, you can also use the Clash Pinpoint feature.

How do I monitor the status of a BIM clash?

VDC/BIM Managers can monitor the status of project coordination as well as run clash tests, add comments, update clash status, and send notifications. If you’ve installed the Revit, AutoCAD, or Navisworks add-ins for gluing models to BIM 360 Glue, you can also use the Clash Pinpoint feature. Find Clashes.