What is CEQA Appendix G?

What is CEQA Appendix G?

Page 1. CEQA APPENDIX G: ENVIRONMENTAL CHECKLIST FORM. NOTE: The following is a sample form and may be tailored to satisfy individual agencies’ needs and project circumstances. It may be used to meet the requirements for an initial study when the criteria set forth in CEQA Guidelines have been met.

What are CEQA requirements?

CEQA requires that state and local agencies disclose and evaluate the significant environmental impacts of proposed projects and adopt all feasible mitigation measures to reduce or eliminate those impacts. The Attorney General, in his independent capacity, has a special role in overseeing and enforcing CEQA.

Does CEQA require EIR?

Under the California Environmental Quality Act (CEQA), an EIR must be prepared whenever there is substantial evidence, in light of the whole record, that a project may have a significant effect on the environment.

What are CEQA documents?

CEQA requires California public agencies to conduct an environmental review process to identify significant environmental impacts of a “project” and to adopt feasible mitigation measures for those impacts before approving a project. CEQA is part of the California Public Resources Code (PRC), beginning with § 21000.

How long is a CEQA document good for?

Outdated CEQA Review and Project Changes If an environmental review was completed 2-10 years prior to the permit, it may be outdated. This would depend on changes to the project and/or changes to the surrounding area of the project.

What are tribal cultural resources?

Tribal cultural resources are defined as sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe that are either included or determined to be eligible for inclusion in the California Register of Historical Resources (California Register) or …

How long does an EIR take?

About 12 to 18 weeks is typical for a Negative Declaration. A typical EIR may take up to a year to complete.

What is an EA vs EIS?

An EA will either result in a Finding of No Significant Impact (FONSI) or if significant environmental impacts appear likely, an EIS. The FONSI determination is made without consideration of any cumulative impacts or geographic context. An EIS is a much more comprehensive document.

When do I need to use CEQA page 4?

7 Instructions Pages 1-3 are only needed when preparing a “checklist” IS. If the checklist will be used in the CEQA environmental document, proceed directly to Page 4 and use that as the beginning of the checklist and follow the guidance in the annotated outlines.

What is a negative declaration under CEQA?

If a project subject to CEQA will not cause any adverse environmental impacts, a public agency may adopt a brief document known as a Negative Declaration. If the project may cause adverse environmental impacts, the public agency must prepare a more detailed study called an Environmental Impact Report (EIR).

What is the purpose of consultation in the CEQA process?

Note: Conducting consultation early in the CEQA process allows tribal governments, lead agencies, and project proponents to discuss the level of environmental review, identify and address potential adverse impacts to tribal cultural resources, and reduce the potential for delay and conflict in the environmental review process.

How do you determine significance in CEQA?

Instructions Click on “Choose an item” under the CEQA Determination column to select the appropriate significance determination from the drop-down list. If discussions will be included after each resource table, follow the guidance provided in the annotated outlines. AESTHETICS