What does a substation design engineer do?

What does a substation design engineer do?

As a substation engineer, your job duties include generating design drawings and documents, determining the appropriate size and type of cables and conduits for each substation, facilitating tasks using engineering application software, and coordinating efforts with team members.

What is grid in substation?

A National Grid substation is a large installation where 275 kV and 400 kV overhead power lines or underground cables are switched and where electricity is transformed to 132 kV for distribution to surrounding areas.

What is a substation electrical engineer?

Substation electrical engineers are engineering professionals who design medium and high voltage substations that are used to transmit and distribute electricity. These engineers are required to maintain substation equipment specifications that are according to the current industry standards and operating policies.

What is the role of transmission engineer?

They may be responsible for evaluating interconnection standards and transmission feasibility, system impact and facility studies or testing new electrical components of wind turbine designs. Their responsibilities may also include working on transmission and/or distribution systems.

What is grid in electrical engineering?

The electrical grid is the electrical power system network comprised of the generating plant, the transmission lines, the substation, transformers, the distribution lines and the consumer.

What is difference between grid and substation?

Grid is a collections of geographical dispersed generation units and load centres which are connected by power lines. Whereas Substation is a part of grid, to step up voltages at generation stations for transmission and step down voltages at load centres for distribution.

How do you become a transmission engineer?

You need a bachelor’s degree in engineering to qualify for an entry-level position as a transmission engineer. You must also complete an Accreditation Board for Engineering and Technology (ABET) certification and have civil or electrical engineering experience.

Why CT and PT are used in substation?

A CT lowers the current signals for measurement purposes, while a PT lowers high voltage values into lower ones. The transformers are designed to measure whether power systems are both accurate and safe. In addition, the CT and PT transformer reduces the current and voltage from high to low value.

What is the highest salary for an engineer?

Best Jobs For Engineering Majors

Rank Job Title Mid-Career Pay
Rank:1 Petroleum Engineer Mid-Career Pay:$158,000
2 Staff Engineer Mid-Career Pay:$116,000
3 Reliability Engineer Mid-Career Pay:$104,000
4 Aerospace Engineer Mid-Career Pay:$102,000

What is HV MV and LV?

This document divides voltages into five classifications. These classifications can be combined into the categories below: High (HV), Extra- High (EHV) & Ultra-High Voltages (UHV) – 115,000 to 1,100,000 VAC. Medium Voltage (MV) – 2,400 to 69,000 VAC. Low Voltage (LV) – 240 to 600 VAC.

What are the geotechnical requirements for a substation?

A geotech survey of the substation needs to be performed to obtain the soil resistivity data to enable this study. Grounding of steel structures inside the substation is important to prevent shock. The ground grid should be designed to dissipate the available fault currents and prevent localized earthrise.

How do you install a low resistivity ground grid?

Connecting the ground grid to the rods so that the grid can access the low resistivity soil. Typically the ground grid is installed at 36” below grade while the ground rods are driven into the soil to a depth of 10 feet. These depths are approximate and vary with design standards of various electric utilities.

What is the purpose of grounding in a substation?

The purpose of grounding is to prevent electric shock and to mitigate overvoltages that can damage equipment. In substations, the high voltage lines carry alternating currents. If you are familiar with Faraday’s induction principle, a time varying flux (due to alternating current) induces voltage in an adjacent conductive equipment.

What should the ground grid be designed to do?

The ground grid should be designed to dissipate the available fault currents and prevent localized earthrise.