What is site plan in construction?
A site plan is a graphic representation of all existing and proposed improvements to a site. Sometimes referred to as a plot plan, the site plan functions as a map for a development project, incorporating all aspects of landscaping, construction, paving, utilities, and terrain features in a single depiction.
How do I create a construction plan?
5 steps to the perfect construction planning process
- Step 1: Create the project. The quick version:
- Step 2: Draft an initial plan. The quick version:
- Step 3: Execute the plan. The quick version:
- Step 4: Track your performance. The quick version:
- Step 5: Close out and evaluate the project. The quick version:
What should a site layout include?
Property Lines. Including the property lines on your development site plan is one of the most important elements.
What should a site plan show?
A site plan can show:
- property lines.
- outline of existing and proposed buildings and structures.
- distance between buildings.
- distance between buildings and property lines (setbacks)
- parking lots, indicating parking spaces.
- driveways.
- surrounding streets.
- landscaped areas.
What do you mean by site plan?
A site plan is a large scale drawing that shows the full extent of the site for an existing or proposed development. Site plans, along with location plans, may be necessary for planning applications. In most cases, site plans will be drawn up following a series of desk studies and site investigations.
How did the contractor prepare the site layout plan?
The contractor prepared the site layout plan as shown in Figure 5. In developing this given plan, the contractor collected the following information to layout the site: – All equipment was delivered before building foundations were complete. All other fitting also delivered (doors, sanitary, etc.). – Generator house completed.
What is included in a site layout plan?
Site layout plans might include locations for and sizes of: Zones for particular activities. Cranes (including radii and capacities). Site offices. Welfare facilities. Off-loading, temporary storage and storage areas (laydown area) Sub-contractor facilities. Car parking.
What are the steps involved in site preparation for construction?
Below are the five necessary steps involved in implementing a site preparation for construction projects. 1. Site Clearing Clearing the site is the very first step in site preparation. The entire site must be in a graded and cleared condition.
What is a site plan for a building permit?
The building department, which might be called the planning department or similar name where you live, requires the site plan as one of the documents to be included in your building permit application. Other documents usually include house drawings, whether formal architectural blueprints or something like graph paper with dimensions.