A: The Buy American provisions direct that, subject to certain exceptions, no Recovery Act funds may be used for a project for the construction, alteration, maintenance or repair of a public building or public work unless all of the iron, steel, and manufactured goods used in the project are produced or manufactured in …

What does the term Buy American mean?

The Buy American Act of 1933 requires the federal government to buy American–made iron, steel, and manufactured goods wherever possible. A product is defined as American–made under “Buy American” if at least 50 percent of its constituent parts and/or materials originated in the US.

What is a flow down clause?

Clauses in a subcontract which incorporate the general contract by reference, and which bind the subcontractor to the general contractor to the same extent the general contractor is bound to the owner, are referred to as “flow down” clauses. Their use is widespread, and they are found in most subcontract forms.

What is the difference in Buy America and Buy American?

Buy American requirements apply to direct purchases by the U.S. federal government valued at more than US$10,000. Buy America requirements apply to purchases of iron, steel and other manufactured products permanently incorporated into infrastructure projects.

Does buying American help the economy?

Supporting the Economy According to Havahart, buying products made in America helps support the national economy, including generating tax revenue and creating more jobs, often in higher-paying positions. In addition, every manufacturing job generates several others that support the primary employee.

What does to flow down mean?

In other words, flow down (in government contracting terms) is the means by which the government imposes the incorporation of prime contract requirements into lower-tier agreements, thereby ensuring consistent application of those requirements.

What is the conduit clause?

The subcontract typically has “pass through” or “conduit” and “pay if paid” clauses. These clauses bind the subcontractor or supplier to the general contract terms and deny any extra time or money for the subcontractor or supplier unless the general contractor obtains relief from the owner.

How does Buy America work?

The Buy American statute says products bought with taxpayer dollars must “substantially all” be made in the U.S. However, today, products could qualify if just 55%–just over half—of the value of their component parts was manufactured here.

Is Canada included in the Buy American Act?

The Parliament committee recognized that Canada is exempt from the Buy American Act of 1933, which applies to the federal government’s procurement of goods.

Does Buy America apply to concrete?

Congress was very specific in including the term “cement” in the Buy America rule and in stating that cement products must be produced in the United States.

What are 2 pros and 2 cons of buying American made items?

Pros and Cons of Buying American Products

  • Pro: You Are Supporting American Workers. No employer is going to build a factory when there is nothing to be made.
  • Con: American Made Goods Are More Expensive.
  • Pro: The Money Stays In America.
  • Con: Foreign Products May Be Built Better.

What the name Jordan means?

to flow down
In Hebrew, the name means “to flow down” or “descend.” Jordan is a biblical name and a perfect baby name option for religious people. In the Bible, John the Baptist baptized Jesus Christ in the Jordan River. Because of this, Christian crusaders brought back water from the river to baptize their children.

What is the meaning of flop down?

to fall or drop heavily: Hugh’s hair keeps flopping over/into his eyes. When she gets home from school, she’s so tired all she can do is flop down in front of the television. SMART Vocabulary: related words and phrases. Moving downwards.

What is a pass through in construction?

A pass-through claim is a claim by the subcontractor who has suffered damages by the owner with whom it has no contract, presented by the general contractor.

How do you qualify for Buy American?

Two conditions must be present for the Buy American Act to apply: (1) the procurement must be intended for public use within the United States; and (2) the items to be procured or the materials from which they are manufactured must be present in the United States in sufficient and reasonably available commercial …

What are the concepts of mandatory flow-down clauses government contracts?

Key concepts of mandatory flow-down clauses government contracts: The prime contract is with the federal government. As a Prime, you want to make sure that some of your contractual obligations flow down to the subcontractor.

What are the Buy American provisions of the Recovery Act?

A: The Buy American provisions direct that, subject to certain exceptions, no Recovery Act funds may be used for a project for the construction, alteration, maintenance or repair of a public building or public work unless all of the iron, steel, and manufactured goods used in the project are produced or manufactured in the United States.

What are the Prime flow down requirements for federal government contracts?

Prime contractors performing federal government projects must ensure that they have the proper prime flow down requirements. Failure to include the appropriate FAR clauses in federal government contracts can result in a termination for default by the government.

What does the Buy American provision apply to?

The Buy American provisions only apply to iron, steel, and manufactured goods brought to the construction site for incorporation into a public building or public work. Products that do not fit the definition of manufactured goods are not covered.